Field, Floor and Floorplan: What’s Really Shaping Barry’s Fall 2026 Renovations?
By Mathew Cole
Barry University is undergoing major campus changes, from a new athletic complex to gym renovations and housing adjustments. Students share mixed reactions as university officials explain the projects, delays and plans for future improvements.

Stepping foot back on campus this August felt less like returning to school and more like wandering onto an active construction site. Over the summer, while most of us were off campus, heavy machinery moved in, familiar buildings traded identities and residential halls were quietly reconfigured.
Between bulldozers carving up our main athletic pitch, the campus gym shifting floors and dorm rooms unexpectedly morphing into singles, students have had plenty of questions: What’s actually getting built? Why didn't anyone give us a heads-up?
To cut through campus rumors, The Buccaneer reached out to university administration to get the facts. Here are the details on the major campus updates every student needs to know.
Much More Than Fresh Turf
If you were assigned to Benincasa Hall, Bevilacqua Hall, or Kolasa Hall this semester, you’ve likely noticed the activity across the way. Looking out toward the field area, the open green space has been transformed into an active construction zone as crews work to address long-standing drainage issues and build out new facilities.
Naturally, the sight of a completely torn-up soccer field sparked immediate chatter. Was this just a slow cosmetic pitch resurfacing, or was something bigger in the works?

According to Jennifer Pugh, Vice President for University Administration, this isn't just a routine patch job. Barry is building a brand-new, multi-sport athletic complex from the ground up.
“The development of Barry University’s new Athletic Sports Complex represents a significant investment in the student experience and in the continued growth of our athletics and recreation programs,” Pugh said. “The project is much broader than the renovation of a single soccer field. It is designed as a multi-sport complex that will support several of Barry’s intercollegiate athletic programs, including the University’s newly added men’s and women’s lacrosse and women’s flag football programs.”
Who’s Paying for It?
A project this large doesn't come cheap. Pugh confirmed the complex is backed by a long-term strategic partnership with Miami Country Day School, a nearby elite private PreK-12 campus, attended by children of celebrities like entertainer Shakira. The arrangement allows both schools to share resources and facilities, with Miami Country Day receiving designated field time. Barry, however, retains full ownership of the property.
The Delay Question
Crews have been working on the site since the spring semester, leading many students to wonder why it wasn't finished before move-in day. Pugh cited bad weather and supply delays—specifically around the fabrication and delivery of the new press box—for slowing down the original timeline.
To keep athletic seasons on track, the university shifted to a phased rollout: Work is wrapping up on the south field first so teams can hold practices while crews finish the north field.
For student-athletes, the temporary displacement created significant daily friction. Didier Jean Baptiste, a senior studying sport management and business administration who plays striker on the soccer team, has been eagerly awaiting the completed project.
“It was tough losing the natural grass field where professional teams like Chelsea, Boca Juniors, and the Colombian national team used to train,” he said. “Switching from grass to artificial turf is a bit of an adjustment and having a 7–8-month construction timeline without a home field meant waking up early for practices over at Miami County Day. But knowing that the complex will be completed soon brings comfort, and we look forward to playing at home again.”
The Finish Line: Barring any further hurricane-season squalls, the university expects the entire complex to be fully operational by early to mid-November 2026.
Gym Shift
If you headed in for a workout this term, you quickly realized the campus lifting scene got a major reshuffle. The Student Fitness Center simply moved downstairs into the former bookstore space right next to the Union Market. The relocation was designed to give the wider student body a much larger, more accessible workout hub right in the bustling core of campus life.
“Together, these enhancements create a more integrated environment where fitness, wellness, dining and student life come together,” Pugh said.
As an added perk for students finishing a workout downstairs, the university introduced a new smoothie station inside the Union Market, just steps from the new weight racks.
Henry Alex Montan, a junior majoring in psychology and marketing, shared his observations of the interior setup.
“I like the new gym overall, but the layout could use some improvement in how the machines are lined up. Adding mirrors would also be very helpful for keeping track of form while working out,” he said.
However, not all feedback on the ground has been glowing. While the square footage downstairs is welcome, several regular lifters have raised concerns that the space was rushed into service before being fully functional.
Alessandro Pellegrino, an honors student double-majoring in finance and international business, voiced stronger criticism regarding the facility's lack of essential amenities.
"The facility lacks basic necessities like lockers or changing room benches,” he said. “Students who need to store their belongings or shower comfortably after a workout are left with a severely incomplete and disappointing setup."
The Upstairs Overhaul for Varsity Athletics:
Meanwhile, the gym's old location upstairs isn't sitting vacant. It was completely renovated and outfitted with brand-new equipment, transforming it into a state-of-the-art Athletic Strength and Conditioning Facility exclusively for Barry’s intercollegiate student-athletes.

With new varsity teams—including men’s and women’s lacrosse and women’s flag football—joining the roster, the upstairs facility provides the dedicated training ground athletes need without crowding out recreation hours for everyone else.
This floor-by-floor split is just the first step in a broader athletic renovation plan. According to Pugh, future phases will bring further upgrades to the Health and Sports Center:
Spring 2027: Construction begins on expanded athletic training spaces and additional varsity locker rooms.
Fall 2027: Anticipated completion date for the full athletic training build-out.
The Housing Shuffle: Singles, Shared Baths, and Summer Makeovers
Move-in day is chaotic under the best circumstances, but several returning, transfer and graduate residents got an unexpected surprise when unlocking their doors this fall. In halls like Mottram-Doss and Sage, rooms previously arranged as doubles were suddenly converted into single-occupancy layouts with shared suite bathrooms. The unannounced switch left students scrambling to adapt to new roommate dynamics, floor plans and housing price points.
Addressing the quiet shift in housing arrangements, Pugh explained that campus residential formats are constantly tweaked based on internal capacity and enrollment tracking.
“Barry University continually evaluates its residential housing needs based primarily on student demand, enrollment trends and the overall residential experience,” Pugh said. “Room configurations are part of that ongoing evaluation and may change as the University considers how best to utilize available housing capacity while responding to the needs and preferences of our students.”
While Mottram-Doss and Sage adjusted to new floor setups, other halls saw standard summer maintenance cycles:
Benincasa Hall: Received full interior paint, fresh carpeting, upgraded bathroom facilities and new LED lighting.
Kolasa Hall: Upgraded with new LED lighting, fresh paint and brand-new carpets.
Administrative Reassignments and Accommodation Friction:
While physical upgrades took place in Kolasa, the sudden shift in floor plans created complications behind the scenes—especially for post-graduate students who had specifically selected singles, only to be redirected into undergraduate halls at the eleventh hour.
Jonathan Karim Fullah, a second-year Specialist in School Psychology (SSP) student in the M.S. & SSP graduate program, experienced this friction firsthand after being reassigned multiple times despite having documented housing needs.
“I really needed a single private,” Fullah told The Buccaneer. “They originally assigned me a single private in Benincasa and I was scheduled to be on the 3rd floor, but then over the summer in July 2026 they re-assigned me again to the first floor then again to Mottram Doss Hall. At that point, it came off to me as though they prioritized someone else over me despite my documented anxiety disorder. Now I’m on a waiting list for a single private since the start of this fall 2026 semester.”
A Promise for Better Communication
Perhaps the biggest frustration for students was finding out about layout and residential changes at the eleventh hour. On that front, Pugh acknowledged the university needs to keep students in the loop earlier.
“If future housing plans or changes will directly affect residents or their housing options, the University will communicate those changes and anticipated timelines to students in advance,” Pugh promised.
Weighing the Scales: What’s Really Being Prioritized?
When you step back and tally what actually changed on the ground, the contrast is hard to ignore: major athletic overhauls on one side, and modest cosmetic fixes or sudden floor-plan shifts on the other.
This disparity leaves several open questions for the student body:
Are these heavy investments aimed primarily at expanding varsity rosters, attracting capital, and courting donors?
How can the administration assure general students that basic residential comforts and amenities won't be sidelined?
Do these campus updates reflect your daily priorities as a student, or do you feel the university is catering to a different audience?





Comments